QPS 

Takes Your Vision to Reality

Explore groundbreaking solutions and exceed expectations with expert partners.

Our 

Projects

Material Handling Project - Cincinnati, OH

Mechanical installation included 2 bag houses, hoppers, three silos, chutes, 40' rotary dryer, three belt conveyors, two bucket elevators, platforms, ladders, structured steel and piping.

Mechanical installation included 2 bag houses, hoppers, three silos, chutes, 40' rotary dryer, three belt conveyors, two bucket elevators, platforms, ladders, structured steel and piping.

Steam & Condensate Piping Project - Shreveport, LA

Construction project installing all steam supply and condensate return lines the newest and most eco-friendly recycle paper mill in Shreveport, LA. Scope of work included fabrication and installation of carbon steel piping to all steam rollers, heat exchangers, fan coils, profiling showers, and starch kitchen components.

Power Plant Project - Crystal River, FL

Construction of material handling structures and systems intended to transfer 1,700 tons of material per hour and reclaim 500 tons per hour.

We completed work on the installation of Portal Reclaimer. It is the largest one designed for the USA.

Tank Demolition Project - Valdosta, GA

Demolished existing white liquor tank at a papermill in southeast Georgia.

After removal of the dome and cutting the remainder of the tank into 6' x 12' sections the crew installed a new secondary containment system. The secondary system was designed by QPS engineering and consisted of SS collection pipes, oiled sand, geo textile material and an XR-5 liner to protect the soil below. The demolition and installation were completed in 12 working days.

Food Industry Project - Salt Lake City, UT

QPS installed switch gear for transportation development in Salt Lake City, UT and providing services on the BART (Bay Area Rapid Transit) system in San Francisco, CA.